YOUR PLUMBING CRASH COURSE: A NECESSITY FOR INSTALLING A BATHTUB

Your Plumbing Crash Course: A Necessity for Installing a Bathtub

Your Plumbing Crash Course: A Necessity for Installing a Bathtub

Blog Article

Book Appointment Now

The article down below involving How to Install a Bathtub: Install an Acrylic Tub and Tub Surround is pretty much enlightening. Check it out for your own benefit and decide what you think of it.


Installing A Bathtub
Setting up a bathtub isn't specifically brain surgery, however it does require solid plumbing, woodworking, and also often, tiling skills. Changing an old tub with a brand-new one is additionally a reasonably tough job. If the old tub is readily obtainable, the task can move immediately; if you need to open up a wall to remove the old bathtub and also position the new bath tub, the task is much harder. In either instance, the job is within a residence handyman's abilities, although you will certainly need a helper to move out the old tub as well as embeded in the brand-new one. Make sure you have qualified yourself for the work as well as fit attempting it. As opposed to working with a professional to take control of a halfway-completed project, it is far better to think about utilizing one prior to you begin. Possibilities are you may require an expert plumber to make tube links.
This article will help you install a new tub in your bathroom if you have actually currently purchased a new tub as well as don't need to transform the arrangement of your previous water pipelines.
Your devices and also product list ought to consist of the following:
  • New Tub

  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Safety Glasses

  • Level

  • Pliers

  • Adjustable Wrench

  • Putty Knife

  • Screwdriver

  • Cold Knife

  • Tape Measure

  • Pipeline Caps


  • Removing Old Taps


    If you need to change old taps with brand-new ones as a part of your installation, then the first thing you need to do is disconnect the water system. After doing so, switch on the faucets to drain pipes any water remaining in the system. The procedure of removing the existing taps can be fairly bothersome due to the restricted gain access to that is frequently the case.
    Utilize a container wrench (crowsfoot spanner) or a tap tool to undo the nut that attaches the supply pipes to the faucets. Have a cloth ready for the continuing to be water that will certainly originate from the pipelines. As soon as the supply pipes have actually been removed, use the very same device to loosen up the nut that holds the faucets onto the bath/basin. You will certainly require to stop the single taps from transforming throughout this process. Once the taps have been gotten rid of, the holes in the bath/basin will certainly need to be cleansed of any type of old sealing compound.
    Prior to carrying on to fit the new faucets, compare the pipeline connections on the old faucets to the brand-new taps. If the old faucets are longer than the brand-new taps, then a shank adapter is needed for the brand-new faucets to fit.

    Fitting New Touches


    If the tails of the new faucets are plastic, after that you will certainly require a plastic port to prevent damage to the thread. One end of the adapter fits on the plastic tail of the tap as well as the various other end provides a link to the current supply pipes.
    If you need to fit a monobloc, then you will certainly need decreasing couplers, which connects the 10mm pipe of the monobloc to the common 15mm supply pipe.
    Next, place the faucet in the placing opening in the bath/basin ensuring that the washers remain in place in between the faucet and the sink. Protect the faucet in place with the supplier supplied backnut. As soon as the faucet is securely in position, the supply pipelines can be linked to the tails of the taps. The faucets can either be linked by using corrugated copper piping or with normal tap adapters. The previous kind should be linked to the faucet ends first, tightening up only by hand. The supply pipelines can later be attached to the other end. Tighten up both ends with a spanner after both ends have actually been connected.

    Setting up the Tub


    Making use of the two wood boards under its feet, position the tub in the called for setting. The wooden boards are handy in evenly spreading the weight of the tub over the area of the boards instead of concentrating all the weight onto 4 little factors.
    The following objective is to make sure that the bathtub is leveled all round. This can be accomplished by checking the spirit level and also readjusting the feet on the tub until the spirit level reads level.
    To mount faucets, fit all-time low of the outermost flexible faucet connector to the appropriate supply pipe by making a compression join; after that do the exact same for the other tap.
    Switch on the water supply as well as check all joints and new pipework for leakages and also tighten them if essential. Load the bathtub as well as also examine the overflow outlet and the typical electrical outlet for leaks.
    Finally, take care of the bathroom paneling as described in the supplier's user's manual. Tiling and also securing around the bathtub must wait till the bathtub has actually been utilized at least once as this will settle it into its last placement.

    Getting ready for the Setup


    First of all, the sustaining framework provided with the bathroom ought to be fitted (if required) according to the manufacturer's instructions. Next off, fit the faucets or mixer to the bathtub. When fitting the tap block, it is necessary to make certain that if the tap features a plastic washer, it is fitted in between the bath and also the faucets. On a plastic bathroom, it is additionally sensible to fit a sustaining plate under the taps system to prevent stress on the bath tub.
    Fit the flexible faucet connectors to the bottom of the two taps making use of 2 nuts as well as olives (often provided with the tub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink electrical outlet opening, and afterwards pass the outlet through the hole in the bath. Utilize the nut provided by the manufacturer to fit the plug-hole. Examine the plug-hole electrical outlet for an inlet on the side for the overflow pipe.
    Next, fit the end of the flexible overflow pipeline to the overflow electrical outlet. After that, screw the pipeline to the overflow face which should be fitted inside the bathroom. Ensure you use all of the supplied washing machines.
    Connect the trap to the bottom of the waste electrical outlet on the tub by winding the string of the waste electrical outlet with silicone mastic or PTFE tape, and screw on the trap to the electrical outlet. Connect the bottom of the overflow tube in a similar manner.The bathroom should now be ready to be fitted in its final placement.

    Tiling Around the Tub


    In the location where the bath satisfies the tile, it is necessary to seal the accompanies a silicone rubber caulking. This is essential as the installation can move sufficient to crack an inflexible seal, causing the water to pass through the wall in between the bath and the tiling, causing complications with moisture and also possible leaks to the ceiling below.
    You can select from a selection of coloured sealers to assimilate your fixtures and also fittings. They are marketed in tubes and cartridges, and also can sealing spaces approximately a width of 3mm (1/8 inch). If you have a larger void to fill up, you can fill it with twists of soaked newspaper or soft rope. Remember to constantly fill up the tub with water prior to securing, to permit the motion experienced when the tub remains in usage. The sealer can fracture fairly early if you do not take into consideration this movement prior to sealing.
    Additionally, ceramic coving or quadrant floor tiles can be made use of to edge the bath or shower tray. Plastic strips of coving, which are easy to use as well as cut to size, are likewise quickly readily available on the market. It is recommended to fit the floor tiles utilizing waterproof or waterproof sticky and also grout.

    How to Install or Replace a Bathtub


    Find Your Dimensions


    The first step in any bathtub installation or replacement is to select the right size tub for your bathroom. Start by measuring your existing bathtub’s alcove from wall to wall. The standard size for bathtubs is around 5 feet long and 30 or 32 inches wide. Purchase the size that’s closest to your previous tub.



    After you’ve measured, you’ll need to figure out what type of tub you need. Face the alcove. If the drain is on the right-hand side, you’ll need a right drain tub. If it’s on the left, get a left drain tub. Easy enough, right?


    Disconnect the Water Supply and Drain Assembly


    Before you can start on your removal, make sure that you turn off the tub’s water supply. Some bathrooms have a shutoff valve, but if you don’t see one, you’ll need to turn off the supply at your house’s water main. Once the water’s off, open the valves to release any remaining air in the supply lines.



    Then, disconnect the tub drain flange. This process varies based on the type of drain you have, but in most cases, you’ll need a drain flange removal tool to perform this task. If you’re feeling handy, you might be able to use a pair of needle-nose pliers to twist and pull the flange.



    Now comes the fun part. In order to disconnect the drain assembly, you’ll need to be able to get to the space underneath the tub. You might need to access the tub drain from a crawlspace or a basement. Don’t forget to take a pipe wrench with you, as you’ll need it to loosen the pipe at the connection.


    Cut Out the Old Tub


    After removing the drainpipe assembly, you can take out the old bathtub. Cut a strip above the tub edge in the wall surrounding the bathtub that's about 6 inches in height. The tools you need here may vary depending on the type of wall surround you have in the alcove. If you’re cutting drywall, use a drywall saw and remove the section of the wall all the way down to the studs. If you have tile, you’ll need to use a grinder with a diamond blade to cut through the grout line. Then, use a chisel to remove the individual tiles. Take care here not to cut through any studs.



    Find the tub flange. Remove the screws that attach the flange to the studs in the wall. At this point, the tub should be freed from the wall.



    Once you’ve removed the flange, use a utility knife to cut away the caulk between the tub and the floor. When this is done, you should be able to lift the tub up and out of the alcove. Keep in mind that, depending on what it’s made of, the old tub could be tremendously heavy. You should plan to have a friend help you move it just in case.


    Install the New Tub


    Before you make any adjustments to the area, place the new tub in the alcove to make sure it fits properly and that the tub drain lines up with the P-trap underneath the floor.



    Remove it and install a 2 x 4 ledger board. Measure the tub’s flange, then mark that height on the wall. Screw the ledger board to studs in the wall. This will help to support the weight of the tub.



    Once the ledger board has been installed, go ahead and secure the drain to the tub. For this step, you’ll need some plumber’s putty. Roll a small amount of putty in your hands and wrap it around the underside of the drain flange. Push the drain into the tub from underneath the tub.



    When the drain has been attached, connect the overflow drain. To do this, you’ll place the gasket on the overflow elbow and move it behind the tub. Once that’s on, connect the overflow pipe and the drainpipe, but take care not to overtighten.


    Secure the Tub


    After the connections are in, it’s time to set the tub in place. Before you start, make sure the flange lines up with the markings you made in Step 4. Because the ledger board holds the tub in place, it’s important that it matches up. If not, you’ll need to remove it and readjust.



    Once your measurements line up, attach the flange to the studs on all three sides of the wall. Please note that you should not screw the flange to the wall. Instead, you should use roofing nails because they won’t rust over time. When the tub is in place, install the baseboard and the molding in front of and around the tub.



    Repair and finish off the drywall or tile that you cut in Step 3. If you’re installing a fiberglass bath surround, now’s the time to adhere it to the alcove.



    Then, enjoy your tub! While all these steps might seem intimidating, removing and installing a new bathtub is a relatively easy DIY project that can be completed in a single day. And now, when you settle in for your next bubbly soak, you can enjoy your bath without the distraction of a tub in disrepair.

    https://www.homeserve.com/en-us/blog/how-to/bathtub-replacement/


    A Step-by-Step Guide to Installing a Bathtub

    As a keen reader about How to Install a Bathtub: Install an Acrylic Tub and Tub Surround, I imagined sharing that piece of content was really helpful. Enjoyed reading our post? Please share it. Help another person locate it. I take joy in reading our article about How to Install a Bathtub.


    Start Now

    Report this page